АБК on a metal frame turnkey: sandwich panels on walls, corrugated sheet with insulation and membrane on the roof, windows and entrance doors, plasterboard partitions with interior doors, column foundation, reinforced concrete floor with porcelain stoneware 600×600 mm, full set of office engineering. Prices Q4 2026, VAT 22%.
We build administrative and domestic buildings on a metal frame turnkey — from design to finishing with a guarantee
Hot-dip galvanized metal frame Z275 is installed twice as fast as a brick or monolithic building. АБК with an area of 200–500 m² is erected «under the roof» in 4–8 weeks — the company's employees move to a comfortable office at least 3 months earlier.
Wall sandwich panels 150 mm PIR provide R≈3.8 m²·K/W — exceed the standard resistance for Novosibirsk (R=3.1 according to MGSN). An additional bonus is a high level of sound insulation against external industrial noise.
Monolithic column foundations for frame columns with a monolithic grillage 250×400 mm is twice cheaper than a continuous strip with equal load-bearing capacity for light АБК on normal soils
Gypsum partitions on a metal profile (KNAUF or equivalent) in one or two layers allow for flexible zoning of the workspace: offices, meeting rooms, restrooms, changing rooms, cloakrooms. They can be easily moved when the staff changes.
Large-format porcelain stoneware 600×600 mm thick 10 mm — the best option for АБК floor: resistant to mechanical stress, easy to clean, meets the requirements for industrial facilities and does not require cyclic replacement
We design and install electricity supply, lighting, heating (gas or electric), supply and exhaust ventilation, air conditioning (split system for each room or VRF), water supply and sewerage — in accordance with the standards for administrative buildings.
From the first call to moving in — a transparent process without delays
We accept the application, clarify the staff, the composition of the premises, the requirements for engineering and finishing
We prepare a quotation within 24 hours. We fix the cost, deadlines, finishing scope and guarantees in the contract
АР, КР, КМ/КМД, КЖ, ЭО, ОВ, ВК — with room layout and coordination with the customer
Foundation → frame → panels → roof → windows/doors → plasterboard partitions → floor → engineering → finishing
Commissioning acceptance, elimination of remarks, transfer of executive documentation and warranty card
Preliminary calculation АБК in 9 sections: design (АР, КР, КМ/КМД, КЖ, ЭО, ОВ, ВК), column foundation with grillage, metal frame (manufacturing + installation), walls made of 150 mm sandwich panels, roofing with corrugated sheet + insulation + ПВХ membrane + gutter, windows and entrance doors, plasterboard partitions with doors, utility networks, floor finishing with 600×600 mm porcelain stoneware
| Section | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| Name of works and materials | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| Name | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| Name | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| Name | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| Name | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| Name | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| System | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
| Name | Unit | Quantity | Price, ₽ | Amount, ₽ |
|---|
Do you need an accurate calculation with room layout?
Request a commercial offerIf you are planning to buildadministrative and domestic building (АБК) on a metal framein Novosibirsk — this calculator from АВ ГРУПП will help estimate the budget from the foundation to the finishing. The calculation covers 9 sections: design (АР, КР, КМ/КМД, КЖ, ЭО, ОВ, ВК), column foundations B25 with a monolithic grillage, hot-dip galvanized metal frame (manufacturing + installation separately), walls made of 150 mm PIR sandwich panels with windows and entrance doors, roof made of load-bearing corrugated sheet + МВ 200 mm + ПВХ-membrane 1.5 mm + storm water drainage, monolithic reinforced concrete floors and ceilings B25 200 mm, internal gypsum board partitions with 50 mm mineral wool and interior doors, a full set of utility networks, finishing flooring with 600×600 mm 10 mm porcelain stoneware. Prices Q4 2026, VAT 22%.
Administrative and domestic building — a building adjacent to a production enterprise or warehouse complex and providing accommodation for administrative staff, domestic facilities for workers (locker rooms, showers, restrooms), as well as auxiliary functions (canteen, first-aid post, entrance). АБК on a metal frame is the fastest and most economical way to create comfortable conditions for staff without major construction.
For administrative and domestic buildings, a roofing pie is used on H-60 corrugated sheet with 200 mm mineral wool and ПВХ membrane 1.5 mm — unlike hangars, which use sandwich panels. This solution provides better performance: a double layer of МВ (2×100 mm) ensures R≈5.0 m²·K/W (exceeds the standard for Novosibirsk R=4.0 according to MGSN), and the ПВХ membrane with mechanical fastening and welded seams guarantees absolute waterproofing with a warranty period of 27+ years.
Internal partitions АБК are made using the KNAUF system (or analogues) on a CW 75 mm metal profile with 50 mm acoustic mineral wool filling and a double layer of GKL 12.5 mm on each side. This design provides sound insulation RW ≥ 47 dB — sufficient to separate offices and meeting rooms. The partitions are installed after the rough work is completed and before the finishing work.
Construction costАБК on a metal frame turnkey with finishingin Novosibirsk is from55,000 to 90,000 rubles per m² of total areadepending on the number of floors and the density of engineering systems. The main range for a typical АБК with 2–3 floors: 60,000–75,000 ₽/m². Finishing the floor with 600×600 mm 10 mm porcelain stoneware is included in the basic calculation.
Are you ready to discuss your АБК project? We do planning and provide a quotation for free within 24 hours.
Get a commercial offerCalculate the budget for your facility before designing — a separate calculator for each type of building with prices for Q4 2026 and VAT 22%