Hangar without internal columns on trusses — maximum free space for equipment and cargo: 120 mm sandwich panels on walls, 150 mm on roof, narrow windows on sides, gates at ends, shallow foundation, monolithic reinforced concrete floor, lighting and heating. Prices Q4 2026, VAT 22%.

7+years on the market
50+objects
8calculation sections
24hpreparing a commercial proposal
scroll down
7+ yearswe build hangars in Siberia
50+ objectscompleted turnkey
Warrantyfor structures and work
No columns insidetrusses — maximum span
Quote in 24 hoursfree of charge
Compliance with deadlinesaccording to the contract

Why choose us
АВ ГРУППfor hangar construction

We build metal-frame hangars with trusses and sandwich panels on a turnkey basis — from design to full readiness with a guarantee

01
Trusses — span without a single column up to 60 m

A design with roof trusses allows spanning up to 60 m without intermediate supports. Absolutely free internal layout — entry of machinery of any dimensions, full rotation in the hall, installation of bridge cranes.

02
Sandwich panels: walls 120 mm, roof 150 mm

120 mm PIR wall panels provide sufficient thermal insulation for a heated hangar at moderate heating costs. Roofing panels 150 mm with an additional rigid layer can withstand a snow load of 240 kg/m² for region IV.

03
Shallow foundation — budget savings

Shallow-depth monolithic strip foundation MZF 400×500 mm with insulated blind area (МЗФЛ according to the Finnish foundation scheme) — the optimal solution for light hangars. Prevents freezing, twice as cheap as a standard deep strip foundation.

04
Doors at the ends — entry for equipment of any height

We design sectional, swing or sliding gates in the end walls — to suit the height and width of your equipment. Gate opening height up to 7–10 m. Additionally — personnel doors and vents for ventilation.

05
Monolithic reinforced concrete floor — load from heavy machinery

Monolithic concrete slab B25 with a thickness of 200–250 mm with reinforcement and industrial topping can withstand the concentrated load from the wheels of trucks, tractors and heavy machinery without deformations or cracks.

06
High-speed installation — 4–12 weeks

A 500–3,000 m² hangar is installed in 4–12 weeks, depending on the span and the complexity of engineering systems. Own installation teams and a metal structures warehouse in Novosibirsk eliminate material waiting time.

How we build:5 turnkey stages

From the first call to the entry of the first car — a transparent process without delays

1
Application and consultation

We accept an application, go to the site, clarify the span, gate height, equipment loads and heat requirements

2
Quote and contract

We prepare a quotation within 24 hours. We fix the price, deadlines, door dimensions, engineering components and guarantees in the contract

3
Designing

АР, КР, КМ/КМД, КЖ, ЭО, ОВ — truss calculation for snow and wind, panel specification, gate nodes

4
Construction

Foundation МЗФЛ → trusses → frame → wall panels → roof panels → doors and windows → floor → engineering systems

5
Project commissioning

Commissioning acceptance, elimination of remarks, transfer of executive documentation and warranty card

Novosibirsk region · Q4 2026 · VAT 22%

Cost calculator
hangar construction

A generalized calculation of a metal-frame hangar with trusses in 8 sections: design (АР, КР, КМ/КМД, КЖ, ЭО, ОВ), shallow foundation МЗФЛ, metal frame with trusses (manufacturing + installation), sandwich panels walls 120 mm + roof 150 mm, narrow windows on the sides + gates at the ends, monolithic reinforced concrete floor, lighting and heating

Hangar parameters
m
m
m
pcs
Built-up area—
Wall area (gross)—
SP walls 120 mm (excluding openings)—
Roof area (with slope)—
SP roofing 150 mm—
Perimeter (storm water drainage)—
Narrow windows on the sides (5% of the side walls.)—
Gates at the ends—
⚙ Regulatory loads (SP 20.13330.2017)Snow:240 kg/m²— IV district · Wind:30 kg/m²— II district
Buildingheated(+5°C min) · Trusses: gable
Span without internal columns up to60 m
Loads and parameters of shallow foundation
Snow + roofing panels (240 + 25 kg/m²)
—
Walls (SP 120 mm ~20 kg/m²)
—
Metal frame (trusses + posts)
—
∑ Design load on the shallow foundation—
Section of the MZF400×500 mm
Length of the MZF (perimeter)—
Volume of B25 concrete—
Insulated blind area—
Specific weight of the metal frame—
Metal frame weight—
01
—
SectionUnitQuantityPrice, ₽Amount, ₽
02
—
Name of works and materialsUnitQuantityPrice, ₽Amount, ₽
03
—
NameUnitQuantityPrice, ₽Amount, ₽
04
—
NameUnitQuantityPrice, ₽Amount, ₽
05
—
NameUnitQuantityPrice, ₽Amount, ₽
06
—
NameUnitQuantityPrice, ₽Amount, ₽
07
—
NameUnitQuantityPrice, ₽Amount, ₽
08
—
SystemUnitQuantityPrice, ₽Amount, ₽
Cost structure by sections
Total
—
Total according to the enlarged estimate
—
including VAT 22% · Q4 2026 · Novosibirsk region
—/ sq. m of development
—Built-up area
—Frame with trusses
—Sandwich panels
—Utility networks
—Metal (t)

Do you need an accurate calculation for your span and loads?

Request a commercial offer
* Rough calculation. Prices are approximate for the Novosibirsk region, Q4 2026, all items including 22% VAT.
Snow load for region IV — 240 kg/m², wind load for region II — 30 kg/m² (SP 20.13330.2017). The building is heated (+5°C min).
Foundation: МЗФЛ B25 400×500 mm with insulated blind area EPS 100 mm, 1 m wide. Exact parameters — after engineering and geological surveys.
Roof: 150 mm PIR sandwich panels with tongue-and-groove joint on truss purlins, gable, slope 6–10°.
Walls: 120 mm PIR sandwich panels, horizontal layout. Gates: sectional lifting with electric drive and 9 kW heat curtain.
The specific weight of the metal frame with trusses is calculated based on the span width. Exact values — after structural calculation.

Hangar construction
with a metal frame and trusses in Novosibirsk

If you are planning to buildmetal frame hangarwithout internal columns in Novosibirsk or the Novosibirsk region — this calculator from АВ ГРУПП will help estimate the budget from the foundation to the completed object. The calculation covers 8 sections: design (АР, КР, КМ/КМД, КЖ, ЭО, ОВ), shallow strip foundation МЗФЛ with insulated blind area, metal frame with pitched trusses (manufacturing and installation separately), sandwich panels for walls 120 mm and roof 150 mm PIR, narrow windows on side walls + sectional doors at the ends, monolithic reinforced concrete floor B25 with industrial topping, LED lighting and heating. Prices Q4 2026, VAT 22%.

Trusses instead of beams — why it's important for a hangar

The key design solution for a hangar with a span over 18 m is roof trusses made of tubular or angle profiles. Unlike a beam frame, where solid-section load-bearing elements require enormous height with a large span, a truss spans 24–60 m with a structure height of 2–4 m and significantly less steel consumption. The entire internal space — from wall to wall, from floor to ridge — remains free for machinery maneuvering, equipment placement, and bridge cranes.

The calculator automatically calculates the specific weight of the metal frame depending on the span: up to 18 m — 35 kg/m², 18–24 m — 48 kg/m², 24–36 m — 62 kg/m², 36–48 m — 78 kg/m², over 48 m — 95 kg/m². This includes roof trusses, columns, purlins, wind and horizontal bracings. The cost is divided into manufacturing (125,000 ₽/t) and installation (38,000 ₽/t).

Hangar sandwich panels: walls 120 mm, roof 150 mm

For hangars with a minimum temperature of +5°C (protection of equipment and machinery from freezing), the following are used:

  • Wall panels 120 mm PIR— heat transfer coefficient λ ≤ 0.022 W/m·K, R ≈ 5.5 m²·K/W. Sufficient to maintain +5°C at -40°C with a heating system of 30–40 W/m²
  • Roofing panels 150 mm PIR— increased thickness for the roof is due to higher heat loss through horizontal surfaces and the load from snow drifts. R ≈ 6.8 m²·K/W
  • Horizontal layout of wall panelsprovides better windtightness and simplifies installation on frame racks without additional purlins

Shallow foundation (МЗФЛ) for a hangar in Novosibirsk

For light hangars with a metal frame in Novosibirsk conditions, the following is usedshallow strip foundation МЗФЛwith a cross-section of 400×500 mm and an insulated blind area made of XPS 100 mm at least 1 m wide around the perimeter (Finnish foundation scheme). This type of foundation is twice as economical as a traditional deep strip foundation with equivalent load-bearing capacity — provided that the blind area is properly constructed to prevent soil freezing under the base.

Hangar gates: sectional lifting with heat curtain

Hangar doors are a critically important element of the building's thermal envelope. Sectional lifting doors (sandwich sections 45 mm, Pu polyurethane foam filling) with an electric drive and an integrated heat curtain of 9–12 kW above each opening ensure a normal temperature regime even with frequent opening in winter. The minimum door opening size is 3.5×3.5 m, the maximum is according to the customer's technical specification (up to 10×10 m).

How much does a metal frame hangar with trusses cost?

Construction costturnkey hangarin Novosibirsk according to Q4 2026 indicators is from18,000 to 45,000 rubles per m² of building areadepending on the span and composition of engineering systems. The main cost factor is the span of the building (width without columns):

  • Span 12–18 m: from 18,000–24,000 ₽/m² — light trusses, cost-effective solutions
  • Span 18–24 m: from 22,000–30,000 ₽/m² — medium trusses, the most common format
  • Span 24–36 m: from 28,000–38,000 ₽/m² — heavy trusses, overhead crane possible
  • Span 36–60 m: from 36,000–50,000 ₽/m² — large-span trusses, aviation hangars