We use cookies and recommendation technologies. By using the website, you agree toPersonal data processing policy.
Cost calculator for the construction of a multi-level parking garage — АВ ГРУПП, Novosibirsk
Novosibirsk and Siberia · We have been working since 2019

Calculate the cost
multi-level parking garage
on a metal frame

Turnkey multi-storey parking: metal frame, monolithic reinforced concrete floors, 50 mm sandwich panels with ventilation grilles, ПВХ roof with 100 mm insulation, ramp, lighting, fire alarm, video surveillance, smoke control ventilation. Prices Q4 2026, VAT 22%.

7+years on the market
50+objects
9calculation sections
24hpreparing a commercial proposal
scroll down
7+ yearswe build parking garages in Siberia
50+ objectscompleted turnkey
Warrantyfor structures and work
Turnkey parkingwith engineering systems
Quote in 24 hoursfree of charge
Compliance with deadlinesaccording to the contract

Why choose us
АВ ГРУППfor parking construction

We build multi-level parking on a metal frame from start to finish — from pile driving work to commissioning with a fire safety certificate

01
In-house production of metal structures

We manufacture load-bearing structures at our production base in Novosibirsk. The parking frame is designed taking into account operational loads from cars 400 kg/m² + snow 240 kg/m².

02
Monolithic reinforced concrete floors according to standards

Flat monolithic slabs B25 with a thickness of 200 mm — the optimal solution for parking floors: minimal structural height, possibility of marking laying, hydrophobic screed 50 mm.

03
Foundation on bored piles

A multi-storey parking requires a pile foundation due to significant vertical loads. We drill piles Ø400–600 mm to the load-bearing layer and construct a monolithic grillage B25 with waterproofing.

04
Complete set of engineering systems

Fire alarm system, smoke control ventilation for staircases, video surveillance system, LED parking space and ramp lighting — all systems are designed, supplied and installed by us.

05
Natural ventilation without expensive mechanics

50 mm sandwich panels with ventilation grilles covering 30% of the wall area provide standard air exchange without the need for mechanical supply and exhaust ventilation for the parking lot.

06
ПВХ roof without leaks for the entire service life

ПВХ membrane 1.5 mm with mechanical fixation and welded seams + EPS 100 mm provides absolute waterproofing of the usable top tier and standard roof insulation.

How we build:5 turnkey stages

From geology to the first car entering — a clear schedule without downtime

1
Application and surveys

We accept an application, visit the site, organize engineering and geological surveys and topographic survey

2
Quote and contract

We prepare a commercial offer in 24 hours. We fix the price, stages, deadlines and guarantees in the contract

3
Designing

АР, КР, КМ/КМД, КЖ, ЭО, ОВ, PS — all sections are coordinated with the customer; fire safety expertise

4
Construction

Piles → grillage → frame → floors → ramp → walls → roof → screed → engineering → marking

5
Project commissioning

Commissioning of systems, acceptance by fire supervision, transfer of executive documentation and warranty card

Novosibirsk region · Q4 2026 · VAT 22%

Cost calculator
multi-level parking garage

A generalized calculation for 9 sections: design, pile foundation with grillage, metal frame, monolithic reinforced concrete floors with 50 mm screed, ramp, walls made of 50 mm sandwich panels with ventilation grilles, roofing EPS 100 mm + ПВХ-membrane + storm water drainage, glazing of staircases, engineering systems

Parking parameters
m
m
floors
pcs
Building area (footprint)—
Total area of all floors—
Calculated number of parking spaces—
Building height—
Wall area (gross)—
Sandwich panels (70% of the walls)—
Ventilation grilles (30% of walls)—
Roof area—
Perimeter (storm water drainage)—
Glazing area of stairwells—
⚙ Regulatory loads (SP 20.13330.2017)Snow:240 kg/m²— IV district · Wind:30 kg/m²— II district
Operational load on the floor:400 kg/sq. m
Cold building (unheated), class CC2
Loads and parameters of the pile foundation
Snow + roof on the building footprint
—
Car load (400 kg/sq. m × N floors)
—
Walls (sandwich panels ~15 kg/m²)
—
Reinforced concrete floors (500 kg/m² × N floors)
—
Metal frame
—
∑ Total load on the foundation—
Pile grid5.0 × 5.0 m
Number of piles Ø400 mm, L=10 m—
Length of the grillage—
Volume of B25 grillage concrete—
Specific weight of the metal frame—
Metal frame weight—
Load on the pile (design)—
01
—
SectionUnitQuantityPrice, ₽Amount, ₽
02
—
Name of works and materialsUnitQuantityPrice, ₽Amount, ₽
03
—
NameUnitQuantityPrice, ₽Amount, ₽
04
—
NameUnitQuantityPrice, ₽Amount, ₽
05
—
NameUnitQuantityPrice, ₽Amount, ₽
06
—
NameUnitQuantityPrice, ₽Amount, ₽
07
—
NameUnitQuantityPrice, ₽Amount, ₽
08
—
NameUnitQuantityPrice, ₽Amount, ₽
09
—
SystemUnitQuantityPrice, ₽Amount, ₽
Cost structure by sections
Total
—
Total according to the enlarged estimate
—
including VAT 22% · Q4 2026 · Novosibirsk region
—/ sq. m of development
—/ sq. m of total area
—/ parking space
—Parking spaces
—Engineering systems
—Number of floors

Do you need an accurate calculation for your site and task?

Request a commercial offer
* Rough calculation. Prices are approximate for the Novosibirsk region, Q4 2026, all items including 22% VAT.
Snow load for region IV — 240 kg/m², wind load for region II — 30 kg/m² (SP 20.13330.2017). The building is unheated, responsibility class CC2.
Pile foundation: bored piles Ø400 mm, L=10 m to the load-bearing layer. Exact parameters — after engineering and geological surveys.
Reinforced concrete floors: monolithic slab B25, thickness 200 mm, operational load 400 kg/m² + self-weight.
Roofing: vapor barrier + EPS 100 mm + ПВХ-membrane 1.5 mm with mechanical fastening and welded seams.
The composition of engineering systems is specified based on the technical specification and fire supervision requirements.

Construction of a multi-level car parking
on a metal frame in Novosibirsk

If you are planning to buildmulti-level parking garage on a metal frameIn Novosibirsk or the Novosibirsk region — this calculator from АВ ГРУПП will help you estimate the budget even before developing design documentation. The calculation covers 9 sections: design (АР, КР, КМ/КМД, КЖ, ЭО, ОВ, PS), pile foundation with monolithic grillage, metal frame, monolithic reinforced concrete floors B25 200 mm thick with 50 mm screed, ramp for entry/exit, walls made of 50 mm sandwich panels with ventilation grilles, roof made of EPS 100 mm + ПВХ-membrane 1.5 mm with external storm water drainage, cold aluminum glazing of staircases, engineering systems (lighting, fire alarm, video surveillance, smoke exhaust ventilation). All prices are valid for the IV quarter of 2026 and include VAT 22%.

Design scheme of a multi-level parking garage

Multi-storey parking on a metal frame — an optimal solution for urban areas with high land costs: with a building footprint of 1,000–2,000 m², you can provide 150–600 parking spaces. The structural scheme includes:

  • Pile foundation— bored piles Ø400 mm, length 10–12 m to the load-bearing layer, monolithic grillage B25 with a section of 800×1000 mm with coating waterproofing
  • Metal frame— columns made of I-beams or pipes on a 5×5 m grid, horizontal beams and lintels, diagonal stiffening ties; specific weight 40–55 kg/m² of the total area depending on the number of floors
  • Monolithic reinforced concrete floors— flat slab B25 with a thickness of 200 mm on a metal permanent formwork sheet or traditional formwork; allows a load from passenger cars of 400 kg/m²
  • Entry/exit ramps— monolithic inclined reinforced concrete slab with anti-slip coating, slope 12–17%, driveway width 3.5 m (one-way traffic)
  • Walls— 50 mm sandwich panels (70% of the area) provide protection from precipitation and wind; aluminum ventilation grilles (30% of the area) ensure standard natural air exchange without mechanical ventilation of the parking garage
Multi-level parking on a metal frame — a building of responsibility class CC2. This requires mandatory design justification of the structures (КР), development of a fire safety section, smoke control for stairwells, and passing the state fire expertise. АВ ГРУПП performs all sections of the design documentation and supports the expertise process.

Roof: EPS 100 mm + ПВХ membrane

The roof of the top level of the parking garage serves as both the roofing of the building and a drive-through area. The roofing pie consists of: a metal load-bearing profiled sheet, vapor barrier, EPS polystyrene foam 100 mm (λ = 0.038 W/m·K, the thickness is adjusted by the slope-forming layer), ПВХ membrane 1.5 mm with mechanical fastening using telescopic fasteners and hot air welding of seams. The external storm water drainage system around the perimeter of the building directs precipitation from the roof into the storm sewer. This solution provides waterproofing with a guarantee of at least 25 years, subject to annual maintenance.

Smoke control ventilation and fire safety

According to the requirements of SP 7.13130.2013 and SP 154.13130.2013 (rules for parking lots), enclosed multi-level parking lots must be equipped with a smoke ventilation system. In parking lots with natural ventilation (through grilles), there are no requirements for mechanical ventilation of the parking lot itself if the opening area is sufficient. However, staircases must be equipped with mechanical smoke ventilation with excess pressure to prevent smoke in evacuation routes. Engineering systems include: address fire alarm system, evacuation notification and control system type 3, water fire extinguishing system (if technical conditions are available) or powder system.

How much does the construction of a multi-level parking lot cost?

Construction costmulti-level metal frame parking garage turnkeyIn Novosibirsk, based on aggregated indicators for Q4 2026, it is from65,000 to 110,000 rubles per sq. m of development areadepending on the number of floors and the complexity of engineering systems. Per parking space:

  • 2-storey parking (footprint 1,000 sq. m, 70–80 parking spaces): from 1.5–2.0 million rubles/parking space — lightweight frame, minimal systems
  • 3-storey parking (footprint 1,000 sq. m, 110–130 parking spaces): from 1.2–1.6 million rubles/parking space — optimal price-to-capacity ratio
  • 4–5-storey parking (footprint 1,000 sq. m, 150–200 parking spaces): from 1.0–1.4 million rubles/parking space — maximum capacity, heavy frame and reinforced foundation

How to get an accurate estimate?

This calculator provides a preliminary budget estimate based on generalized indicators. To get an accurate estimate, you need: a technical passport of the land plot, a geological report (determines the type and length of piles), a design assignment with requirements for the number of parking spaces, traffic scheme, number of floors and composition of engineering systems. АВ ГРУПП specialists will develop a conceptual scheme and prepare a commercial offer free of charge within 24 hours after your request.

Are you ready to discuss your multi-level parking project? We will call you back within 30 minutes and prepare a commercial offer for free.