We use cookies and recommendation technologies. By using the website, you agree toPersonal data processing policy.
Novosibirsk and Siberia · We have been working since 2019

Calculate the cost
sports hall and ФОК
on a metal frame

Turnkey sports and recreation complex: metal frame with unsupported trusses, sandwich panels 150 mm, warm glazing on the main facade, roof МВ 200 mm + ПВХ-membrane, sports floor, changing rooms with showers, stands, climbing wall, gym, cafeteria, administrative part. Prices Q4 2026, VAT 22%.

7+years on the market
50+objects
9calculation sections
24hpreparing a commercial proposal
scroll down
7+ yearswe build sports facilities
50+ objectscompleted turnkey
Warrantyfor structures and systems
Turnkeywith equipment and stands
Quote in 24 hoursfree of charge
Compliance with deadlinesaccording to the contract

Why choose us
АВ ГРУППfor the construction of ФОК

We build sports halls and fitness and health complexes on a turnkey basis — from design to commissioning with equipment

01
Clear span for any span

Metal trusses span from 18 to 60 m without intermediate columns. There are no supports inside the hall that would interfere with the marking of the area and the movement of athletes.

02
Compliance with SP 31-112 and SanPiN standards

We design the height, illumination (750–1500 lux), ventilation (exchange rate ≥ 10 h⁻¹), sports floor and changing rooms in accordance with the standards for physical education and sports facilities.

03
Sandwich panels 150 mm — comfort at −40°C

PIR panels 150 mm on walls and МВ 200 mm on the roof ensure maintaining +16°C in the playing area and +20°C in the changing rooms with minimal heating costs in the Siberian climate.

04
Sports floors for any sport

Monolithic slab B25 200 mm + professional polyurethane coating 12 mm meets the requirements of FIBA (basketball), FIVB (volleyball), FIFA (mini-football). Cutting of marking lines is included in the cost.

05
Equipment with sports equipment and bleachers

We supply and install basketball backboards, volleyball poles, mini-football goals, climbing wall, gym equipment, stands (metal frame + plastic seats) and LED scoreboards.

06
Transparent estimate from foundation to chair

The cost of all nine sections — construction, utility networks, auxiliary premises and sports equipment — is fixed in the contract. No additional estimates during the construction process.

How we build:5 turnkey stages

From the technical assignment to the first training session — strictly according to the schedule

1
Application and technical specifications

We accept applications and help to draw up a technical assignment: types of sports, number of stands, composition of premises, requirements for height and lighting

2
Quote and contract

We prepare a quotation within 24 hours, indicating the equipment composition, list of rooms and total cost. We fix it in the contract

3
Designing

АР, КР, КМ/КМД, КЖ, ЭО, ОВ, ВК, technical specification — including calculation of trusses, lighting, ventilation and sports field markings

4
Construction

Foundation → frame with trusses → walls (sandwich panels 150) → roof ПВХ → floors → utility networks → auxiliary rooms

5
Equipment installation

Installation of stands, sports equipment, climbing wall, exercise machines. Commissioning. Handover with executive documentation

Novosibirsk region · Q4 2026 · VAT 22%

Cost calculator
sports hall / ФОК

Aggregated calculation for 9 sections: design, column foundation + base belt, metal frame with unsupported roof trusses, walls made of sandwich panels 150 mm + warm glazing + light boxes, roof МВ 200 mm + ПВХ-membrane, sports floors (concrete + polyurethane + markings), utility networks, auxiliary rooms, sports equipment and stands

Building parameters
m
m
m
seats
Built-up area—
Building height—
Wall area (gross)—
Warm glazing (65% of the main facade)—
SP 150 mm (other walls)—
Roof area (with slope)—
⚙ Regulatory loads and normsSnow:240 kg/m²— IV district (SP 20.13330.2017)
Wind:30 kg/m²— II district
Building heating +16°C · Lighting750–1,500 lux
Ventilation:≥ 10 h⁻¹(SP 31-112, SanPiN)
Sports component
Play areas
pcs
floor
m high
Additional zones
m²
m²
Basketball/volleyball courts—
Mini-football fields—
Climbing wall—
Gym—
Group exercise room—
Changing rooms + showers (12% of the hall)—
Administrative part (6% of the hall)—
Cafeteria (5% of the hall)—
Loads and foundation parameters
Roofing (35 kg/m² + snow 240 kg/m²)
—
Walls (SP 150 mm ~30 kg/m²)
—
Metal frame with trusses
—
∑ Design load on the foundation—
B25 pillars (perimeter, step 6 m)—
Load per pillar—
Base belt 250×600 mm—
Volume of B25 strip concrete—
Volume of earthworks—
Frame specific weight (with trusses)—
Metal frame weight—
01
—
SectionUnitQuantityPrice, ₽Amount, ₽
02
—
NameUnitQuantityPrice, ₽Amount, ₽
03
—
NameUnitQuantityPrice, ₽Amount, ₽
04
—
NameUnitQuantityPrice, ₽Amount, ₽
05
—
NameUnitQuantityPrice, ₽Amount, ₽
06
—
NameUnitQuantityPrice, ₽Amount, ₽
07
—
SystemUnitQuantityPrice, ₽Amount, ₽
08
—
NameUnitQuantityPrice, ₽Amount, ₽
09
—
NameUnitQuantityPrice, ₽Amount, ₽
Cost structure by sections
Total
—
Total according to the enlarged estimate
—
including VAT 22% · Q4 2026 · Novosibirsk region
—/ sq. m of development
—/ spectator seat
—Built-up area
—Utility networks
—Equipment
—Auxiliary rooms

Do you need an accurate calculation for your sports zones?

Request a commercial offer
* Rough calculation. Prices are approximate for the Novosibirsk region, Q4 2026, all items including 22% VAT.
Snow load for region IV — 240 kg/m², wind load for region II — 30 kg/m² (SP 20.13330.2017). The building is heated (+16°C).
Foundation: column foundation B25 along the perimeter (6 m step) + base belt 250×600 mm. Exact parameters — after engineering and geological surveys.
Sports floor: monolithic slab B25 200 mm + polyurethane coating 12 mm (FIBA/FIVB/FIFA compatible).
Auxiliary rooms are calculated as a share of the building area: changing rooms + showers 12%, administrative 6%, cafeteria 5%.
Basketball/volleyball courts — combined (1 court = 1 basketball court + 1 volleyball net). The rock climbing wall equipment is specified in the technical specification.

Construction of a sports hall and ФОК
on a metal frame in Novosibirsk

If you are planning to buildsports and fitness complexIn Novosibirsk or the Novosibirsk region — this calculator АВ ГРУПП will help estimate the full budget from foundation to sports equipment installation. The calculation covers 9 sections: design (АР, КР, КМ/КМД, КЖ, ЭО, ОВ, ВК + technical assignment), column foundation with base belt, metal frame with unsupported roof trusses, walls made of sandwich panels 150 mm with warm glazing and light boxes, roof МВ 200 mm + ПВХ-membrane + storm water drainage, sports floors, utility networks, auxiliary rooms (changing rooms with showers, administrative part, cafeteria), sports equipment and stands. All prices are valid for the IV quarter of 2026 and include VAT 22%.

Metal trusses are the key to column-free space

The main requirement for a sports hall building is the absence of intermediate columns in the playing area. This is ensured by the use of truss metal trusses that span the entire width of the building (18–60 m) without intermediate supports. The specific weight of the frame with trusses is much higher than that of a conventional warehouse building:

  • Span up to 18 m(gym, group exercise room): 55 kg/m² — light trusses
  • Span 18–24 m(volleyball, basketball small): 72 kg/m² — medium trusses
  • Span 24–30 m(two basketball courts): 92 kg/m² — heavy trusses
  • Span 30–36 m(mini-football 20×40 m + stands): 112 kg/m² — reinforced trusses
  • Span over 36 m(large universal hall): 135 kg/m² — special long-span trusses
The calculator automatically determines the specific weight of the metal frame based on the span width and calculates the cost of manufacturing (125,000 ₽/t) and installing the trusses (55,000 ₽/t) separately. Installing trusses is more complex and expensive than installing a beam frame — a special crane with a large boom reach is required.

Sports floor: FIBA, FIVB and FIFA requirements

Professional playing surfaces for basketball, volleyball and mini-football must comply with international standards for deformation characteristics, friction and ball reflection. The calculator uses the following floor composition:

  • Monolithic slab B25, 200 mm thick, on a crushed stone base of 100 mm (horizontal leveling ±2 mm per 3 m)
  • Polyurethane sports coating 12 mm with vulcanized structure (coefficient of friction 0.4–0.6, vertical deformation 3–10 mm according to EN 14904)
  • Multi-color marking of court lines (basketball, volleyball, mini-football) — stencil application

Sports hall ventilation: why is it so expensive

The ventilation system is the most expensive of the engineering systems in a sports hall (9,200 ₽/m² versus 4,800 ₽/m² for heating). The standard air exchange rate in sports halls is at least 10 times per hour (according to SP 31-112 and SanPiN for physical education and sports facilities). With a hall area of 1,500 m² and a height of 8 m, the volume of air that must be supplied and extracted every hour is 120,000 m³/h — this requires powerful ventilation units with heat recovery, an extensive system of air ducts and adjustable diffusers for uniform air distribution across zones.

Composition of sports equipment ФОК

The calculation includes a standard set of equipment for the selected sports:

  • Basketball/Volleyball— for each court: folding wall-mounted basketball backboards with motorized lift, FIBA-class basketball hoops, volleyball poles with tension mechanism and net, floor fixing system. Cost: 275,000 ₽/court
  • Mini-football— for each field: 3×2 m goals made of square profile with nets, anchor fastening system to the floor. Cost: 140,000 ₽/field
  • Climbing wall— steel spatial structure, plywood sheathing 18 mm, 50 hooks per m², safety zone with mats (ПВХ coating + penopropylene 30 cm). Cost 45,000 ₽/m² of wall surface
  • Gym— treadmills, elliptical trainers, exercise bikes, strength training equipment, free weights, racks, mirrors. Cost: 45,000 ₽/m²
  • Group exercise room— dance floor (laminate or rubber), mirrors, choreographic bars, mats, cardio bar, sound system. Cost 18,000 ₽/m²
  • Grandstands— metal frame made of hot-dip galvanized profile + GROSFILLEX plastic chairs or equivalent, side railings, flooring. Cost: 28,000 ₽/seat
  • LED scoreboard and PA system— digital scoreboard 4×3 m with control, sound notification system with amplifiers and hanging acoustic speakers. 380,000 + 320,000 ₽ per object

How much does it cost to build ФОК in Novosibirsk?

Construction costsports and fitness complex turnkeyIn Novosibirsk, based on aggregated indicators for Q4 2026, it is from65,000 to 120,000 rubles per m² of building areataking into account the equipment and stands. In terms of a spectator seat in a 500-seat parquet hall — about 1.5–3.5 million rubles per seat (including the entire cost of the building).

Are you ready to discuss your sports hall project or ФОК? We will prepare the technical assignment, concept and quotation for free within 24 hours.

Get a commercial offer