AZIMUT Hotel Siberia

Strengthening of load-bearing building structures
Read more Leave a request
4 months
Construction time
2000 m2
Area of the object
2020 year
Year of implementation
How we built
Our work at this site involved strengthening the load-bearing structures of the building. We received technical specifications and drawings from the Customer. According to them, we needed to strengthen the existing columns and the junctions with the beams. The columns that needed to be strengthened were located in the basement of the building, 160 meters deep into the building. To carry out the work, it was also necessary to dismantle and install the internal engineering networks of the building to lay the concrete pump pipeline mainline. The work was completed within the timeframe specified in the contract, despite the spread of COVID-19 in the Novosibirsk region

Construction progress

Strengthening of load-bearing structures
What services will you need?
We will tell you more about how we can be useful. Leave your contacts and we will call you back.
By clicking the button, you consent to the processing of personal data and agree to the privacy policy
Completed projects
Show more