Construction of a cold storage warehouse for packaging
How we built
The client saved money due to optimizing design solutions without violating construction technology
Our regular Customer received a technical assignment. The task was to develop a project and build a cold storage warehouse for packaging on the territory of an existing plant. After studying the Customer's technical assignment, we began to work out the options. We considered the following options: - using LSTK; - tent hangar; - steel frame made of black metal sheathed with corrugated sheet; After a detailed study of the cost and manufacturing time for each building option, the choice fell on a steel frame made of black metal sheathed with corrugated sheet. We prepared a 3D model of the future warehouse for the Customer. With its help, we discussed the nuances that could arise during the building's operation and took them into account. Then we proceeded to carry out turnkey construction work. We completed the task by installing the building envelope in 2 months.
Construction progress
We carried out the construction from excavation to the installation of technological equipment
Building frame model
Building frame model
Installation of base slabs
Formwork installation
Concrete foundation work for the building
Installation of the metal frame of the building
Installation of purlins
Building frame
Base planning for floor installation in the building
Installation of corrugated sheet
Finished product warehouse interior
Completion of building construction
What services will you need?
We will tell you more about how we can be useful. Leave your contacts and we will call you back.
By clicking the button, you consent to the processing of personal data and agree to the privacy policy